Franklin Lakes Roa over Pond Brook

0.14 Mi. W. of C.R. 89 · County 003, New Jersey · Built 1931 · 2 Lanes · 8,304 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
02C2003
Year Built
1931
Length
10.7 m (35.1 ft)
Max Span
9.4 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
8,304
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,374,000
Total Project Cost
$2,161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.