NJ 4 WB & RAMP E over I-95 SB LOCAL&RAMPS F&G

0.5 MI WEST OF GWB · County 003, New Jersey · Built 1962 · 3 Lanes · 47,240 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0206186
Year Built
1962
Reconstructed
1995
Length
61.9 m (203.1 ft)
Max Span
41.5 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
47,240
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.