WYMAN AVE over PISCATAQUA RIV BACK CHNL
0.1 KM SOUTH OF SR 103 · County 015, New Hampshire · Built 1941 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
This bridge is in worse condition than 84.8% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 85 years old.
Bridge Details
- Structure #
- 1NH0BR2
- Year Built
- 1941
- Reconstructed
- 1984
- Length
- 61 m (200.1 ft)
- Max Span
- 30.5 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $475,000
- Total Project Cost
- $510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.