PIPER POND RD over BROOK

TOWN RD · County 013, New Hampshire · Built 1983 · 1 Lanes · 96 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
027500810006600
Year Built
1983
Reconstructed
2020
Length
8.2 m (26.9 ft)
Max Span
6.7 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.