NH116 NH142 over BOG BROOK

0.1 MI FROM JCT ROUTE 3 · County 007, New Hampshire · Built 1956 · 2 Lanes · 4,726 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
027401030009500
Year Built
1956
Length
55.2 m (181.1 ft)
Max Span
19.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
4,726
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.