NH123 over COLD RIVER

1.34MI SE VT SL · County 005, New Hampshire · Built 2008 · 2 Lanes · 2,804 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
026200780006600
Year Built
2008
Length
32.9 m (107.9 ft)
Max Span
32 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
2,804
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.