WESTPORT ROAD over ASHUELOT RIVER

.68 MI NE WINCHESTER TL · County 005, New Hampshire · Built 1862 · 1 Lanes · 792 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
025100800009000
Year Built
1862
Reconstructed
2001
Length
43.6 m (143 ft)
Max Span
37.5 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
792
Material
Wood or Timber
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.