NH 11 over OTTER POND OUTLET

0.5 MI. FROM NEW LONDON T · County 019, New Hampshire · Built 1954 · 2 Lanes · 7,212 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
024701210016500
Year Built
1954
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
7,212
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.