NH 9 over N BR CONTOOCOOK RIVER

0.1 MI NE TO ANTRIM T/L · County 005, New Hampshire · Built 1999 · 2 Lanes · 7,112 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
024201830010600
Year Built
1999
Length
22.1 m (72.5 ft)
Max Span
19.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
7,112
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.