US 2 over CONNOR BROOK

0.2 MI FROM MAINE SL · County 007, New Hampshire · Built 1960 · 2 Lanes · 2,894 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023601680007900
Year Built
1960
Reconstructed
2009
Length
15.5 m (50.9 ft)
Max Span
14.6 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
2,894
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.