NH 97 over SPICKET RIVER

.5MI W MASS SL · County 015, New Hampshire · Built 1958 · 2 Lanes · 16,144 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022801180010400
Year Built
1958
Reconstructed
1994
Length
17.7 m (58.1 ft)
Max Span
16.5 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
16,144
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.