NH 32 over MARTIN BROOK

1.61 MI S SWANZEY TL · County 005, New Hampshire · Built 1970 · 2 Lanes · 1,641 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022001140013600
Year Built
1970
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,641
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.