NH125 over CSX

.8 MI FROM JCT NH121 · County 015, New Hampshire · Built 1992 · 5 Lanes · 19,888 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021401110006200
Year Built
1992
Length
27.4 m (89.9 ft)
Max Span
24.4 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
19,888
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.