RIVER ROAD over BROOK

.72 MI. SW JCT. 10 AND 25 · County 009, New Hampshire · Built 1951 · 2 Lanes · 943 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
020900660015900
Year Built
1951
Reconstructed
1987
Length
8.1 m (26.6 ft)
Max Span
6.7 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
943
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.