US202 NH101 over CONTOOCOOK RIVER

2.5 MI. W. DUBLIN TL · County 011, New Hampshire · Built 2024 · 3 Lanes · 18,622 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
020800860007600
Year Built
2024
Length
56.7 m (186 ft)
Max Span
25.6 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
18,622
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.