SPRING ROAD over NUBANUSIT BROOK

0.2 MI FR DUBLIN TL · County 011, New Hampshire · Built 1940 · 2 Lanes · 214 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
020800500014100
Year Built
1940
Reconstructed
1997
Length
20.4 m (66.9 ft)
Max Span
8.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
214
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.