WALNUT AVE over I-95

0.5 MI JCT NH151 · County 015, New Hampshire · Built 1975 · 2 Lanes · 995 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

42.984133, -70.851747

This bridge is in worse condition than 30.1% of bridges in County 015. The average bridge in New Hampshire is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
019700890012300
Year Built
1975
Length
88.1 m (289 ft)
Max Span
42.7 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
995
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.