I-89 SB over COLUMBUS AVENUE

2.9 MI SUTTON T.L · County 013, New Hampshire · Built 1967 · 2 Lanes · 9,810 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.409256, -72.02605

This bridge is in worse condition than 17.8% of bridges in County 013. The average bridge in New Hampshire is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
018800790008400
Year Built
1967
Reconstructed
1989
Length
21 m (68.9 ft)
Max Span
19.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
9,810
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.