DEPOT ROAD over S BR PISCATAQUOG RIVER

3.8 MI N OF VERNON TL · County 011, New Hampshire · Built 1993 · 2 Lanes · 109 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017901040010700
Year Built
1993
Length
20.4 m (66.9 ft)
Max Span
18.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
109
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.