EAST DUNSTABLE RD over FEE TPK RAMP 4CD

0.01 MI FROM SALMON BK · County 011, New Hampshire · Built 1996 · 7 Lanes · 21,720 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017701230007300
Year Built
1996
Length
67.4 m (221.1 ft)
Max Span
37.8 m
Width
33.2 m (108.9 ft)
Lanes
7
Daily Traffic
21,720
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.