FEE TPK over SOUHEGAN RIVER

0.8 MI FROM BABOOSIC RD · County 011, New Hampshire · Built 1953 · 4 Lanes · 75,081 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016801110011500
Year Built
1953
Reconstructed
2011
Length
69.8 m (229 ft)
Max Span
25.6 m
Width
37.5 m (123 ft)
Lanes
4
Daily Traffic
75,081
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.