BEAN ROAD over BABOOSIC BROOK

365 FT FR PROFILE DRIVE · County 011, New Hampshire · Built 2016 · 2 Lanes · 1,004 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016800720015500
Year Built
2016
Length
21.3 m (69.9 ft)
Max Span
19.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,004
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.