NH 10 over ABBOTT BROOK

1.9 MI. FROM GILSUM TL · County 005, New Hampshire · Built 1964 · 2 Lanes · 1,869 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
016401170006700
Year Built
1964
Length
6.7 m (22 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
1,869
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.