NH124 over MINNEWAWA BROOK

0.1 MI. FROM JCT. NH 101 · County 005, New Hampshire · Built 1967 · 2 Lanes · 4,006 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016300770012200
Year Built
1967
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,006
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.