I-93 NB over COHAS BROOK

1.6MI E JCT RT 28 · County 011, New Hampshire · Built 1962 · 4 Lanes · 38,772 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016101870013400
Year Built
1962
Reconstructed
2021
Length
46.6 m (152.9 ft)
Max Span
17.1 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
38,772
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.