I-93 SB over I-293 EBN

1.4 MI E JCT NH 28 · County 011, New Hampshire · Built 1961 · 3 Lanes · 26,271 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016101690012400
Year Built
1961
Reconstructed
1992
Length
25.9 m (85 ft)
Max Span
24.1 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
26,271
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.