SOUTH ROAD over I-89

.8 MI E OF JCT US 202 · County 013, New Hampshire · Built 1959 · 2 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

43.182942, -71.67475

This bridge is in worse condition than 48.5% of bridges in County 013. The average bridge in New Hampshire is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
012901230007700
Year Built
1959
Reconstructed
1991
Length
57.6 m (189 ft)
Max Span
17.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
96
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.