US 3 NH 25 over SQUAM RIVER

4.0 MI FR CENTER HARBOR T · County 009, New Hampshire · Built 1976 · 2 Lanes · 3,490 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012601400008800
Year Built
1976
Length
13.4 m (44 ft)
Max Span
11 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
3,490
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.