NH 3A over NEEDLE SHOP BROOK

1.4 MI FROM FRANKLIN · County 013, New Hampshire · Built 1940 · 2 Lanes · 2,664 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012301570010800
Year Built
1940
Length
7.9 m (25.9 ft)
Max Span
6.7 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
2,664
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.