NH114 over AMEY BROOK

1.17 M. SE WARNER TL · County 013, New Hampshire · Built 1951 · 2 Lanes · 3,928 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012000990015600
Year Built
1951
Reconstructed
1981
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,928
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.