TOWN FOREST ROAD over COCKERMOUTH RIVER

0.1 MI FROM GROTON ROAD · County 009, New Hampshire · Built 2007 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011800800010600
Year Built
2007
Length
21.4 m (70.2 ft)
Max Span
20.4 m
Width
5.7 m (18.7 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.