NH 25 over OLIVERIAN BROOK

1.5 MI W BENTON TL · County 009, New Hampshire · Built 1975 · 2 Lanes · 776 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011700670009200
Year Built
1975
Reconstructed
2019
Length
25.9 m (85 ft)
Max Span
21.6 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
776
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.