CHESHAM ROAD over MINNEWAWA BROOK

0.3 MI FR DUBLIN TL · County 005, New Hampshire · Built 1939 · 2 Lanes · 1,191 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
011500560005800
Year Built
1939
Reconstructed
1984
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,191
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.