MIDDLE ROAD over MCDOWELL RESERVOIR

.9 MI FR PETERBORO TL · County 011, New Hampshire · Built 1950 · 2 Lanes · 488 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011201090005400
Year Built
1950
Length
9.4 m (30.8 ft)
Max Span
3.7 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
488
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.