DAVIS ROAD over SMITH RIVER

95FT. RTE 4 · County 009, New Hampshire · Built 2011 · 2 Lanes · 335 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
009901230010400
Year Built
2011
Length
10.4 m (34.1 ft)
Max Span
9.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
335
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.