I-93 SB ON RAMP over I-93

4.9 MI LINCOLN TL · County 009, New Hampshire · Built 1959 · 1 Lanes · 2,646 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
008701280010400
Year Built
1959
Reconstructed
1991
Length
85.6 m (280.8 ft)
Max Span
24.7 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
2,646
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000