SO NEW BOSTON ROAD over S BR PISCATAQUOG RIVER

0.67MI. NEW BOSTON TL · County 011, New Hampshire · Built 2020 · 2 Lanes · 289 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
008601490005800
Year Built
2020
Length
32.3 m (106 ft)
Max Span
25 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
289
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.