NH111 over LITTLE RIVER

1.4 MI FROM JCT 101C · County 015, New Hampshire · Built 1930 · 2 Lanes · 6,155 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
008200780007000
Year Built
1930
Reconstructed
1981
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
6,155
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.