NH 27 over NH101

JCT NH 27/NH101 · County 015, New Hampshire · Built 1999 · 4 Lanes · 11,782 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008200680010200
Year Built
1999
Length
66.8 m (219.2 ft)
Max Span
32.6 m
Width
24.8 m (81.4 ft)
Lanes
4
Daily Traffic
11,782
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.