NH108 over OYSTER RIVER

.2 MI FR JCT. RTE. 4 · County 017, New Hampshire · Built 1991 · 2 Lanes · 11,978 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.130983, -70.918753

This bridge is in worse condition than 30.1% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
007001140011100
Year Built
1991
Length
9.5 m (31.2 ft)
Max Span
7.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
11,978
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.