US 4 WB over SP TPK NH 16

0.4 MI JCT US 4 · County 017, New Hampshire · Built 2020 · 5 Lanes · 14,360 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
006501820003600
Year Built
2020
Length
59.1 m (193.9 ft)
Max Span
29.3 m
Width
28.3 m (92.8 ft)
Lanes
5
Daily Traffic
14,360
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.