PINE HILL ROAD over CROYDON BRANCH SUGAR R

0.1 MI NH 10 · County 019, New Hampshire · Built 1989 · 2 Lanes · 562 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
005601430012000
Year Built
1989
Length
22.9 m (75.1 ft)
Max Span
21.3 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
562
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.