CARLETON HILL ROAD over MOHAWK RIVER

0.15 MI SE JCT NH 26 · County 007, New Hampshire · Built 1935 · 2 Lanes · 451 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
005001020008300
Year Built
1935
Length
17.1 m (56.1 ft)
Max Span
16.2 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
451
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.