NH114 over WARNER RIVER

3.8 MI FROM WARNER TL · County 013, New Hampshire · Built 1948 · 2 Lanes · 4,002 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
002801460014000
Year Built
1948
Length
26.5 m (86.9 ft)
Max Span
23.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
4,002
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.