US302 NH 10 over NHRR(ABD)

1.6 MI. FROM HAVERHILL TL · County 009, New Hampshire · Built 1990 · 2 Lanes · 4,216 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001801230007000
Year Built
1990
Length
109.7 m (359.9 ft)
Max Span
47.5 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
4,216
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.