US302 over SACO RIVER

1.7 MI SW OF RTE 16 · County 003, New Hampshire · Built 2008 · 2 Lanes · 4,065 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001701900013000
Year Built
2008
Length
71.2 m (233.6 ft)
Max Span
34.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
4,065
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.