I-93 NB over COLLINS ST SQUAM RIVER

.07 MI NEW HAMPTON T.L. · County 009, New Hampshire · Built 1963 · 2 Lanes · 10,875 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001100890005000
Year Built
1963
Reconstructed
1990
Length
54.6 m (179.1 ft)
Max Span
26.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
10,875
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.