NH 11 over NHRR(ABD)

0.6 MI FROM FRANKLIN TL · County 013, New Hampshire · Built 1929 · 2 Lanes · 2,674 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000802060013700
Year Built
1929
Length
54.6 m (179.1 ft)
Max Span
16 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
2,674
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.