NH 12A NH123 over COLD RIVER

0.7 MI. FROM LANGDON TL · County 005, New Hampshire · Built 2009 · 2 Lanes · 1,265 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000500590016000
Year Built
2009
Length
27.5 m (90.2 ft)
Max Span
26.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,265
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.