I15S over US95

N SPAGHETTI BOWL · County 003, Nevada · Built 2018 · 3 Lanes · 160,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
I3221S
Year Built
2018
Length
99.3 m (325.8 ft)
Max Span
49.3 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
160,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.